Redhill Office Building
Contractor removed old gypsum floor from the 80’s. Poured back a bullet proof topping of 3/4″ Level-Right Self Leveling underlayment over Maxxon MR at 19,000 square feet.



Contractor removed old gypsum floor from the 80’s. Poured back a bullet proof topping of 3/4″ Level-Right Self Leveling underlayment over Maxxon MR at 19,000 square feet.