Corona High School Gymnasium
Set elevations with a laser to provide a flat and level floor to the high tolerance requirements set for a new gymnasium floor. Approximately 12,000 square feet of Dura-cap was poured from 1/4″ up to 1-1/2″ to achieve this. Geary Hardwood Floors, was given a turnkey floor for their install crew.